Find the element that sits off the model while it can still be moved.

As-Built Compare registers a monthly drone-captured site surface to your design model and flags the exterior elements outside the tolerance band you set. It is an early-access check that runs between formal as-built surveys.

GSD
UAV, under 10 cm
Cadence
Monthly
Platform
Drone / crewed aircraft
Spectral
RGB
Reported by
Element ID
Schematic plan: a design wall line with a dashed tolerance band, and an installed line that drifts outside the band, with the gap bracketed. [ Δ > tol ]DESIGN ± TOLAS-BUILT
Fig. 1. Schematic: the design line in black, the installed line in blue, the gap bracketed. Not a sample output.

How a deviation gets found now

The contractor marks up record drawings as the work goes in, and a licensed as-built survey is commissioned at a milestone or at project close. In between, the owner's BIM/QA lead learns about a footing, slab edge or wall line that sits off the model from a site walk, an RFI, or the next trade finding that its work doesn't fit.

By the time the survey shows it, the concrete has cured and the next scope has been built on top. The fix is a demolition or a change order with a design workaround, and someone has to decide who pays. The monthly pay-application review comes and goes with nobody having compared the installed work to the model in the meantime.

The survey isn't the problem. It certifies the work, and it comes late by design. What's missing is a look in the months between that says which elements have drifted while the crew is still on site and the pour is still fresh in everyone's mind.

A concrete frame going up floor by floor, slab edges and columns lit low by the evening sun, shoring props under the top deck
Slab edges and columns on a concrete frame, mid-build.

What comes back each month

  1. 2.1Surface

    Design-registered as-built surface

    A reconstructed surface of the site from that month's drone flight, aligned to your design model's coordinates. It is the base the comparison runs on. On a pilot, it covers the project area you pick.

  2. 2.2List

    Out-of-tolerance element list

    Every element whose deviation exceeds the tolerance band you supplied, with its element ID and how far off it sits. This is the list the QA lead takes to the contractor.

  3. 2.3Map layer

    Deviation map layer

    A layer that shows where the deviation sits and how large it is, so you can find the element on site and in the model.

  4. 2.4CSV

    CSV export by element ID

    The same list as a spreadsheet, keyed to the element IDs in your model, ready to paste into your issue log.

How a pilot runs

  1. Design model supplied

    Send the design model for the exterior, above-grade elements and the tolerance band your specification sets. Tell us where ground control is already established on site.

  2. Monthly drone capture

    A drone flight over the site each month, timed ahead of your progress review. Crewed aircraft is an option.

  3. Surface registered to the model

    The reconstructed surface is aligned to your model using the ground control you have. We tell you how well it tied in before anyone reads a deviation.

  4. Out-of-tolerance elements flagged

    The list, the map layer and the CSV come back. Elements that can't be compared, because they were covered or hidden, are listed with a reason.

Between the formal surveys

Use it as the monthly look that tells you where to send the surveyor or the QA engineer, before the pay-application review. The flagged elements go into your issue log and to the contractor for a field check against the model. If the field check confirms a deviation, you find out this month rather than at closeout. If it doesn't, you have your answer.

The licensed as-built survey still certifies the work at milestone and at close. This does not stand in for it and does not replace how your team federates and coordinates the model.

Limits

  1. L1

    Screening check, not a survey

    A licensed as-built survey and your model federation process stay the record. Nothing here certifies an installed element.

  2. L2

    Exterior, above grade only

    The comparison uses drone imagery of the outside of the site. Interior work, MEP, anything below grade and anything covered by hoarding, scaffold wrap or finished cladding is out of scope.

  3. L3

    Resolution floor

    Under 10 cm a pixel is wider than the tolerance on most finish work. The check finds elements that sit off the model by more than the surface can resolve, and it can't judge a tight tolerance band. Small elements are not checked at all.

  4. L4

    Registration depends on your control and your model

    How well the surface ties to the model depends on the ground control on site and the quality of the model you send. A loose tie shows up as deviation that isn't real, which is why the registration quality comes back with every delivery.

  5. L5

    Weather and access

    Flights need workable weather. A wet or windy month can push the capture, and anything hidden from above, such as the underside of an overhang, isn't seen.

  6. L6

    Monthly, and early access

    The cadence is monthly, a target rather than a guarantee. This is a pilot-stage offer we are onboarding projects onto, not a finished monitoring product.

Who it's for

For

  • An owner's BIM/QA lead or BIM manager checking installed elements against the design model during construction.
  • An owner's representative who wants a monthly signal on drift before the pay application is signed.
  • A team that holds a design model with element IDs and a specified tolerance band.

Not for

  • Anyone looking for a replacement for a licensed as-built survey or record drawings.
  • Interior, MEP or below-grade verification.
  • Contractors looking for layout, stakeout or machine control.
  • Projects without a design model.

Questions before early access

Does this replace a licensed as-built survey?

No. It is a screening check between formal surveys. Certifying the installed work still needs your licensed process.

What tolerance band do you use?

The one your project specifies. The comparison runs against the band you supply.

Can it check MEP or interior elements?

No. It uses exterior drone capture, so it covers above-grade elements you can see from the air.

How good is the registration?

It depends on the ground control on site and the model you send. Each delivery says how well the surface tied in, so you know how far to trust the deviations.

How do we check it against our own survey?

Pick an area where your surveyor has recently produced as-built points and don't send us those. When the delivery arrives, compare our flagged elements with the survey and decide whether the check is good enough to use between surveys.

What model formats can you take?

Tell us what your model is authored in and how you exchange it. We'll confirm what we can read before you commit.

Who owns the surface and the imagery?

A specialist will confirm ownership and licence terms for the deliverables and the imagery. Ask early if your counsel needs to review.

How is a pilot bought and priced?

A specialist will go through pricing and how a pilot would run once they know your project.

Is this available today?

It is an early-access offer, and we are onboarding pilot projects now.

Tell us about your model and your next progress review.

Send the model format, the tolerance band and when the next review falls. We'll tell you whether a pilot fits.