Imprint

FlyPix AI GmbH

Robert-Bosch-Str. 7

64293 Darmstadt,Germany

T. +49 6151 7076949

info@flypix.ai

Represented by

Sergey Sukhanov, Ivan Tankoyeu

Register

Entry in: Handelsregister

Register Number: HRB 105309

Register Court: Amtsgericht Darmstadt

VAT number: DE362377202

Accountability for content

We put real care into the content of this site, but we cannot promise it is always accurate, complete, or current. Under applicable law we are responsible for our own content on these pages, though we are under no obligation to monitor third-party information for signs of unlawful activity. Where the law requires us to remove or block such information, we will, per §§ 8 to 10 of the Telemedia Act (TMG).

Accountability for links

This site links to external websites whose content we do not control and are not responsible for; each linked site's operator answers for their own content. We checked these links for obvious violations before adding them and found none. Should a linked page later turn out to be unlawful, we will remove the link as soon as we are made aware.

Copyright

Everything on these pages is protected under German copyright law. Reproducing, editing, distributing, or otherwise using material from this site beyond what copyright law allows requires the written consent of whoever holds the rights to it. Personal, non-commercial copies are the one exception; anything else without permission is a copyright violation.

← Back to As-Built Compare