Blog

  1. 2026-11-16

    Field notes: the shaft that was two inches out of plumb

    A story about a two-inch plumb deviation on an elevator shaft, and how three people each assumed someone else had already flagged it.

  2. 2026-11-16

    What an IFC model is, and why a superseded baseline wrecks a deviation report

    A deviation report is only as good as the model it's compared against. Here's why comparing against a superseded IFC baseline produces false positives.

  3. 2026-11-09

    How to prioritize which trades to check first in a monthly as-built flyover

    A practical order for checking trades against the design model each flyover, before concrete, drywall, or roofing cover the evidence.

  4. 2026-11-09

    What is a tolerance threshold, and how do BIM teams set one for as-built checks?

    A plain explanation of tolerance thresholds in as-built checks: what counts as an out-of-tolerance element and how QA teams set the number.

  5. 2026-11-02

    Field notes: the punch list that started as a drone report

    A rooftop curb set three inches off plan turned a routine monthly flyover into the punch list item that saved a trade from redoing ductwork.

  6. 2026-11-02

    What is a federated model, and why as-built checks need one

    A federated model links every discipline's geometry into one coordinated view. Here's why as-built verification should check against it, not one trade model.

  7. 2026-10-26

    Crewed aircraft or drone for a large campus capture?

    How GSD, cadence, and site size decide whether a large campus build should capture as-built data by drone or crewed aircraft.

  8. 2026-10-26

    Redline drawing vs as-built drawing: what's the difference?

    Redlines are field markups made during the work. As-builts are the final record set. Here's where they diverge and why that gap matters.

  9. 2026-10-19

    Field notes: the month a steel beam was two inches off and nobody caught it until drywall

    A two-inch steel deviation sat hidden for weeks until drywall hit it. What that gap in visibility costs, and when it should have surfaced.

  10. 2026-10-19

    How to set a tolerance band for structural steel vs. curtain wall

    Structural steel and curtain wall need different deviation thresholds. Here's how to set a tolerance band for each in your as-built comparison.

  11. 2026-10-14

    Superintendent walkthrough vs. monthly drone capture: what each one actually catches

    A punch walk and a monthly drone pass catch different problems. Here's what each one finds, and where the gap between them hides rework.

  12. 2026-10-14

    What is a clash in BIM, and how is it different from a site deviation?

    Clash detection catches model-on-model conflicts before construction. Site deviations show up after. Here's the difference, and why timing changes the cost.

  13. 2026-10-13

    RTK vs PPK for drone survey accuracy on construction sites

    RTK and PPK both correct drone GPS positions, but they do it at different points in the workflow. Here's what that means for as-built accuracy.

  14. 2026-10-13

    What is LOD in BIM, and why it matters when you're checking as-built

    LOD defines what a BIM element is supposed to represent, and that shapes what a deviation means in LOD 300 vs LOD 400 as-built checks.

  15. 2026-10-07

    How often should you fly a job site for progress monitoring?

    Weekly, biweekly, or monthly drone flights? A practical look at flight cadence for catching as-built deviations before rework gets expensive.

  16. 2026-10-07

    Photogrammetry vs lidar for construction progress tracking

    A field-level look at photogrammetry vs lidar for tracking construction progress against the design model, and which one catches deviations early.

  17. 2026-10-07

    What is construction tolerance? Allowable deviation explained

    A plain-language breakdown of what construction tolerance means, where allowable deviation numbers come from, and why checking them matters.

  18. 2026-10-07

    What is point cloud registration in construction?

    Point cloud registration lines up a scan with a design model so you can compare them. Here's what that involves on a job site.